  • Week 5 - Build Season 2017 Week 5 of build season was very busy and hectic for The Drop Bears!In Mechanical, the section remained focused and hard working as they came to the end of the build phase. The climbing group had completed their game piece to a high standard and were very proud of their efforts. Soon after, they were able to mount the mechanism onto the drive base - it was all coming together. Gears completed their design and worked on creating and approving drawings so that the fabrication process could be started. By the end of the week, some components were finished but unfortunately the entire mechanism was not able to be completed.The drive base group worked on the bumpers to make ...
    Posted 17 Feb 2017, 01:44 by Ellie Hebden
  • Week 4 Update - Build Season 2017 Week 4 of build season was one of our busiest yet, however our designs were coming together and our robot was starting to form.Mechanical was under the pump this week to finish a long to-do list. The climbing group had completed their CAD to an impeccable standard, and drawings had been made and approved. They then moved on into the fabrication phase to get their game piece completed and on the robot. The gears group was working on the very challenging design for our active mechanism. It was a tedious process, but one of the most complex mechanisms we have ever designed, so we needed to do it properly! Hence, the week was spent doing CAD, design meetings ...
    Posted 16 Feb 2017, 23:46 by Ellie Hebden
  • Week 3 Update - Build Season 2017 Week three of Build Season was very busy for The Drop Bears. As we moved into the high level design phase, most of our days were filled with CAD, Design reviews and more CAD. Although this was a tedious process, we all understood that this was the most important part of creating a good robot.The climbing group was working hard and finished their final CAD at the beginning of the week. They then set off to create their drawings before final fabrication. As our team values our quality control procedure, we made sure every drawing was of high quality and signed off before anyone went down to the workshop.The gears groups continued to work on their CAD over ...
    Posted 4 Feb 2017, 16:12 by Ellie Hebden
  • Week 2 Update - Build Season 2017 Welcome to week two of build season 2017! It was a very week busy as usual. As we moved into the prototyping phase, groups set out to make and modify the designs from week 1. The climbing group was off to a great start, they were able to produce their design and have a fully working prototype. At the end of the week the robot was able to climb at 100% accuracy. The drive base team has fully assembled the drive base and a temporary electronics board has been placed on to practice driving the robot. The drive base chassis has been fully CADed as well as bumpers and electronics. Driver training has been going well with our drive team ...
    Posted 27 Jan 2017, 00:26 by Ellie Hebden
  • Week 1 Update - Build Season 2017 Week 1 was an exciting and busy week for The Drop Bears. After 2017 Build Season Kick Off! on Sunday, we continued to work on our strategy on Monday. We all met that night to present our ideas to the group. After a long discussion of weighing up the pros and cons of each, we decided on our team's strategy. Everyone was happy to have made the first big decision for the season, our robot was slowly beginning to come together. Now that this was decided, we were able to start the design phase. Again, we split up into four groups and began brainstorming and fleshing out ideas for the robot. The next three days consisted of long conversations ...
    Posted 17 Jan 2017, 00:12 by Ellie Hebden